The logic of the regulation on excavation and demolition waste, segregation practice on site, and where recycled aggregate can and cannot safely be used.

29 August 202611 min read Ozan Global Holding
Waste Management in Construction and Recycled Aggregate: Where Can It Be Used?

The largest volume a construction site on the Bodrum peninsula produces is often not the building itself but the rock from excavation and the rubble left by demolition. This material is either hauled to a distant tip for a lorry fee or properly segregated and put back to work. The difference is decisive in terms of cost, the environment and the regulations alike. A site that dumps demolition waste in a stream bed without a permit faces administrative penalties, while a site that crushes the same concrete and uses it as road sub-base saves on both haulage and material. Recycled aggregate is the key product of this cycle; but it cannot be used everywhere, and it does not always substitute for natural aggregate. Knowing the limits turns the sustainability slogan into a system that works on site.

What Is Construction and Demolition Waste, and What Does It Include?

Waste leaving a site falls into three main groups. Excavation soil is the soil, rock and natural material that comes out during excavation; if not chemically contaminated, it is regarded as a resource rather than waste. Construction waste is the surplus concrete, brick, mortar, timber, metal, gypsum, packaging and insulation left over during building. Demolition waste is the mixed rubble from dismantling an existing structure: reinforced concrete fragments, brick, ceramic, glass, timber doors and windows, plumbing metal and roofing material.

Within these groups, hazardous waste stands as a class of its own. Asbestos-containing roof sheets, pipe insulation and floor tiles in old buildings; lead-based paint; tar-based waterproofing; drums of chemical admixture all fall into this class. Once hazardous waste gets mixed into a rubble skip, it makes the whole skip hazardous and the disposal cost multiplies. The pre-demolition survey of the building is carried out to locate these materials.

The practical importance of the classification is that each group goes to a different destination. Clean excavation soil goes to fill and rehabilitation sites, concrete and brick rubble to a recovery plant, metal to the scrap dealer, timber and packaging to the relevant recycling channel, and hazardous waste to a licensed disposal facility. Material left mixed is condemned to the most expensive route, mixed-waste landfill.

The waste profile in Bodrum differs from other regions. Most of the excavation is limestone rock; in demolition, old stone buildings and reinforced concrete summer houses from the 1980–2000 period dominate. Natural stone from a stone building is a valuable material for reuse; rubble from reinforced concrete demolition is crushed and screened into aggregate. The site’s waste plan should be built around this profile.

The Logic of the Regulation: Separate at Source, Transport with Documentation, Deliver to a Licensed Site

The basic text governing this area in Türkiye is the Regulation on the Control of Excavation Soil, Construction and Demolition Waste. Without going into its details, its logic can be summed up in three sentences: waste is collected separately at source, transported by licensed vehicles with documentation, and delivered only to storage or recovery sites designated by the competent authority. Each of these three principles creates a concrete responsibility on site.

Separation at source aims to keep waste from leaving the site mixed. The regulation obliges the waste producer to store excavation soil, construction waste and demolition waste without mixing them, and to keep hazardous waste separate. Documented transport allows the waste to be tracked from where it left to where it went; the vehicles carrying it must be licensed and every trip recorded. The licensed-site rule prevents waste being dumped in a stream bed, an olive grove or a vacant plot; municipalities designate and inspect the storage and recovery sites.

Within this framework, projects above a certain size are expected to produce, before construction begins, a waste management plan showing the quantity and type of waste, how it will be segregated and where it will be sent. The plan may look like a formality, but when properly prepared it shapes the site’s logistics: how many skips, at which points and how often they will be emptied, and whether excavated rock will be crushed on site or hauled away are all answered here.

On site, the logic of the regulation translates into a chain of responsibility. The site that produces the waste, the haulier that carries it and the site that accepts it are each responsible in their own right; but for waste dumped in an unpermitted place, the first party sought is the owner of the waste. That is why checking the haulier’s licence, asking for an acceptance record for every trip and keeping those records in the site file protects the site in terms of both compliance and reputation. A missing file during a municipal inspection turns into a suspicion of unpermitted dumping.

Excavation Soil and Excavated Rock: The Big Item on a Bodrum Site

On a hillside plot, the basement and foundation excavation brings out rock amounting to several times the building’s footprint in volume. Hauling this rock away by lorry is both costly and a logistical burden on Bodrum’s narrow roads. The first question is: how much of the excavated material can stay on site? The cut-and-fill balance should be calculated at the start of the project. Garden terracing, road fill, backfill behind retaining walls and drainage beds are the natural uses for excavated rock.

Excavated rock does not go into fill as it comes. Large blocks cannot be compacted; voids remain between them and settle over time. If crushing and screening can be done on site, the rock is reduced to a specified size and compacted in layers; because of noise and dust, this work is subject to permits and working-hour restrictions near residential areas. If a mobile crusher cannot be set up, the rock is hauled to a recovery plant or a licensed excavation soil tip, and screened crushed stone is bought in for the fill.

For excavation soil to count as a resource, it must be clean, that is, free of chemical contamination. In an excavation on the site of a former industrial plant, filling station or workshop, there is a chance the soil is contaminated; in that case the material is not used in fill without analysis, nor is it delivered to an ordinary excavation soil tip. Such plots are few in Bodrum, but care is needed around boatyards, repair shops and former warehouse sites.

In excavation logistics, timing is decisive. In the summer season, heavy vehicle traffic is restricted in some parts of the peninsula; scheduling excavation and haulage for the winter–spring period brings advantages in both permits and cost. We covered the region’s seasonal logistics separately in the construction season and material supply guide.

How Is Recycled Aggregate Produced, and How Does It Differ from Natural Aggregate?

Recycled aggregate is the material obtained by crushing and screening concrete and brick rubble. The production sequence is as follows: steel, timber, plastic and gypsum are picked out of the demolition rubble; the remaining mineral fraction goes through a jaw crusher, the remaining steel is removed by a magnetic separator, and secondary crushing and screening then split it into the required particle sizes. The quality of the product depends largely on how clean the input is; well-segregated concrete rubble yields a homogeneous aggregate, whereas the product from mixed rubble is variable.

The difference from natural limestone aggregate comes from the old mortar residue stuck to the particles. This residue is porous; as a result, the water absorption of recycled aggregate is markedly higher than that of natural aggregate, its density lower and its abrasion resistance weaker. Used in concrete, it soaks up mixing water, reduces workability and requires pre-wetting. High water absorption also harms durability under freeze–thaw and in saline environments.

Products with a high proportion of brick and ceramic are even more limited as concrete aggregate; these are used mainly as fill and sub-base material. Concrete-derived recycled aggregate, on the other hand, can be used in lower-class concretes when correctly graded and limited to a certain proportion. The concrete aggregate standard TS EN 12620 defines recycled aggregate through specific categories and tests; material that does not meet this definition is not used in concrete.

Quality control, as with natural aggregate, is carried out on grading, water absorption, density, clay and fines content and the amount of foreign matter (timber, plastic, gypsum). Gypsum is especially important; as a source of sulphate it causes delayed expansion in concrete. Asking a plant for its quality records and test results when buying recycled aggregate is as natural as asking for quarry certificates when buying natural aggregate. We explained the effect of aggregate on concrete strength in detail in the article on aggregate quality and concrete strength.

Where It Can and Cannot Be Used

The areas where recycled aggregate is used with confidence are those where durability and high strength are not the deciding factors. The most common use is road sub-base and fill: site roads, beneath car parks, the layer under pavements and general site fill. Recycled material is accepted under TS EN 13242, which covers unbound and hydraulically bound materials for road construction. In these applications the material is laid and compacted in layers and behaves like natural crushed stone.

The second area is low-class concrete applications: in non-structural elements such as blinding, levelling concrete and garden wall footings, part of the natural aggregate can be replaced with recycled aggregate. Common practice is to stay within a certain proportion of the coarse aggregate and to keep the fine aggregate natural; recycled fines make the mix unmanageable because of their high water absorption.

The third area is drainage and landscaping. Coarse oversize crushed concrete serves as drainage bedding and backfill material; but here too the fines and gypsum content must be low, otherwise the drain clogs and sulphate leaches out.

The places where it should not be used are at least as clear as the places where it can. Recycled aggregate is not preferred in structural concrete, particularly in elements such as columns, beams, shear walls and foundations where high strength and durability are required; if it is to be used, the design engineer’s approval, conformity with the standard category and a low proportion are essential. In seaside and saline-environment concrete it is avoided altogether; high water absorption speeds up the ingress of chloride into the concrete. The details are in the article on concrete by the sea. Hydraulic structures, prestressed elements and precast products also call for natural aggregate, because product quality relies on repeatability and the variability of recycled aggregate undermines it.

In short, the rule is this: as load and exposure increase, the share of recycled aggregate decreases. Full replacement in fill, partial replacement in low-class concrete, natural aggregate in structural and marine concrete. Any decision that breaks this order may look like a saving, but it comes back as a durability cost.

Segregation Practice on Site: Skips, Labels, Records

Segregation is set up from the start, not improvised on site later. In demolition this means selective demolition: doors, windows, plumbing metal and timber come out first; then the roof and insulation; and the reinforced concrete skeleton is broken up last. This sequence keeps the concrete rubble clean and its recovery value high. A building knocked down in one go with an excavator produces mixed rubble, and recovering that rubble is either expensive or impossible.

A construction site needs at least four separate collection points: clean concrete and brick rubble; metal; timber and packaging; hazardous waste. Gypsum-based material (plasterboard, gypsum plaster offcuts) must be kept separate and not mixed into the concrete rubble. Skips are distinguished by colour or large-lettered labels, their positions are shown on the site plan and posted at the entrance. Subcontractors learn this system when they start work, and the consequence of leaving mixed waste is written into their contracts.

Records are the proof of segregation. Each time a skip is emptied, the date, waste type, estimated quantity, haulier and destination site are noted, and the acceptance receipt is added to the file. This simple table is the single source both for regulatory inspection and for the project’s sustainability reporting. The monthly total is compared with the forecast in the waste management plan; if there is a deviation, the cause is investigated.

If crushing is to be done on site, a small area is set aside and the relevant permit obtained covering dust, noise and working hours. If the crushed material is to be used on site, grading is checked with a simple sieve test; the particle size distribution of material going into fill determines how well it compacts. If crushing on site is not economical, clean concrete rubble is delivered to a recovery plant; the plant’s acceptance fee for clean material is lower than for mixed rubble, and some plants accept clean concrete free of charge.

Finally, training: a segregation system succeeds in the worker’s hands, not on paper. A short site briefing, visual labels and a weekly inspection round are the cheapest way to stop skips getting mixed. Sorting a contaminated skip afterwards always costs more than setting up the segregation system properly at the start.

Natural Aggregate and Recycling Together: The Group Approach

Recycled aggregate is not a rival to natural aggregate but a complement to it. The region’s construction volume needs both quality limestone aggregate and responsible management of demolition rubble. The right system uses each material where it belongs: graded crushed stone from the quarry for structural concrete and precast products, recycled material for fill and sub-base. Keeping the two apart is right for quality; planning the two together is right for resources.

In quarry operations, sustainability is the other heading to be considered alongside recycling: phased extraction, dust and water management, and rehabilitation of the site when extraction ends. In concrete production, recovering wash water, separating residual concrete from truck mixers, and crushing and reusing returned concrete at the plant yard are all part of the cycle. In concrete pipe and paver production, mould offcuts and broken products are recovered on the same principle.

A practical road map for a site comes down to four steps. At the start of the project, prepare the cut-and-fill balance and the waste management plan. If there is demolition, apply selective demolition and identify hazardous materials beforehand. Set up the segregation points and the record-keeping from day one. Use recycled material only in the applications it is suited to, backed by test results; for structural concrete and marine environments, insist on natural aggregate.

As Ozan Global Holding, we describe how we handle this cycle across our activities, from aggregate production to ready-mix concrete and from concrete pipes and precast infrastructure to logistics, on our sustainability page. Our limestone quarry in Milas, İTS Maden, produces graded aggregate, crushed stone and sub-base material; to plan your site’s fill and concrete needs together, you can reach us through the contact page.

Frequently Asked Questions

Can recycled aggregate be used in structural concrete?
In general practice it is not preferred. If it is to be used, the design engineer’s approval, conformity with the relevant standard category and a low proportion limited to the coarse aggregate are required. Natural aggregate is used for seaside, hydraulic, prestressed and precast elements.
Is excavation soil waste?
Excavation soil and excavated rock that are not chemically contaminated are regarded as a resource rather than waste; they can be used for fill, terracing and rehabilitation sites. Their transport and storage, however, are still carried out within the framework of the regulation, with documentation and at licensed sites.
Why is dumping demolition rubble on vacant land a problem?
The Regulation on the Control of Excavation Soil, Construction and Demolition Waste requires that waste be delivered only to sites designated by the competent authority. Unpermitted dumping brings administrative penalties, and the first party held responsible is the owner of the waste. Dumping in a stream bed or on agricultural land may also constitute an environmental pollution offence.
How many separate waste points should a site have at minimum?
In practice, four: clean concrete and brick rubble; metal; timber and packaging; hazardous waste. Gypsum-based material must be kept apart from concrete rubble because it is a source of sulphate. The skips are labelled and every emptying is recorded.
How should demolition start on an old building suspected of containing asbestos?
The building is surveyed before demolition; asbestos-containing roof sheets, pipe insulation and floor tiles are identified. Normal demolition begins only after these materials have been removed by licensed crews and sent to a licensed disposal facility. Asbestos getting into a rubble skip turns the whole skip into hazardous waste.
Why does the water absorption of recycled aggregate matter?
The old mortar residue on the particles is porous; the material absorbs mixing water, reduces workability and weakens durability under freeze–thaw and in saline environments. If it is to be used in concrete, pre-wetting and an adjustment to the mix design are needed; it is not used in marine environments.