Behind every load that enters a site there is a document: for the aggregate lorry, the pallet of pumice blocks, the concrete pipe, the cement silo. On most sites these documents are put in a file but never read. Yet a certificate of conformity does not tell you the name of the product; it tells you what performance it carries and by whom and how that performance was verified. A single line read wrongly can turn into a durability problem in a building by the sea, or a gap in the file at the occupancy stage. The difference between the G mark and CE, the critical lines of the declaration of performance and how to verify a document on site are practical matters that everyone who takes delivery of material needs to know.

What Is a Certificate of Conformity For, and Who Does It Bind?

Construction product certification is a chain of trust. The producer declares the measured performance of its product; behind that declaration sit laboratory tests and factory production control. Depending on the risk of the product, an independent body steps in, audits the factory or tests the product separately. The user in turn looks at the declaration and decides whether the product is suitable for their own project. When any link of the chain breaks, the risk on site is merely covered over by the document; it does not disappear.

The most common mental error here is to treat the document as a quality award. The document does not show that the product is good; it shows that it may lawfully be placed on the market and what performance values have been declared. Two aggregates certified by two different producers against the same standard may fall into completely different performance classes. The right question is not “does it have a document” but “is the declared performance good enough for my intended use”.

The question of liability must be thought through clearly as well. When unsuitable material goes into a structure, it is not only the producer who is liable but also the parties who accepted and used it. The building owner, the contractor, the site manager and the building inspection body are all in this chain. Asking for the document on site and filing it is your first line of defence in any dispute that arises later; it is very hard to bring a producer to account afterwards for a load accepted without documentation.

There is an administrative side as well. On jobs subject to statutory building inspection, product conformity documents form part of the inspection file and are examined at the occupancy permit stage. A missing document in the file generates months of correspondence on a completed building. A piece of paperwork that could have been obtained in three minutes on the day the load arrived becomes impossible to get a year later, once the producer no longer remembers the batch.

The Difference Between the G Mark and the CE Mark

The two marks are not rivals; their scopes complement one another. The CE mark is used for construction products that have a harmonised European standard or a European technical assessment. For these products the producer determines the essential characteristics required by the standard through testing and factory production control, draws up a declaration of performance and affixes the CE mark to the product. Concrete aggregate, concrete pipes, masonry units, cement and most precast concrete products fall in this field.

The G mark, by contrast, is the national conformity mark used in Türkiye for construction products that have no harmonised European standard and are subject to national regulation. The logic is similar: the product is assessed against a relevant national or accepted technical specification, a body carries out the conformity assessment, and the G mark is affixed to the product. The two scopes are mutually exclusive; a product is either in the CE field or in the G field. Do not expect to see both on the same product.

The picture met on site in practice is this: for products with a European standard, look for the CE mark and the declaration of performance; for those without, look for the G mark and the Turkish declaration that accompanies it. The document has to be in Turkish; if an imported product comes with a document only in a foreign language, you are entitled to ask for the Turkish version. This is not a formality but a matter of comprehension: a document whose performance lines you cannot read is of no use to you.

Both marks draw a lower limit. If you are working in an earthquake zone, on the coast or in aggressive ground, there can be a serious gap between the minimum legal requirement and the performance your project needs. The document states the intended use for which the product has been declared; using it outside that use does not invalidate the document, but it leaves the responsibility entirely with you. Using a material declared for road fill in structural concrete, for example, is your decision and not the document’s.

The Declaration of Performance: Which Line Tells You What?

The declaration of performance is the identity card of a CE marked construction product. It usually runs to one or two pages and contains the following information:

  • The unique identification code of the product type
  • The intended use of the product (for example, aggregate for concrete, aggregate for unbound mixtures)
  • The name, registered trade name and contact address of the producer
  • The system applied in assessing the constancy of performance
  • The harmonised standard applied and, where relevant, the name and identification number of the notified body
  • The essential characteristics and, for each of them, the declared performance value or class
  • The name and position of the person signing the declaration, together with the place and date

The most critical line is the unique identification code of the product type. This code must match exactly the product named on the delivery note in your hand and on the pallet label. If the document says “0-4 mm washed sand” while 0-5 mm crusher sand arrives on site, the document you are holding is not the document for that load. This matching check is the fastest and most effective verification that can be done on site.

The second critical line is the intended use. A producer may draw up more than one declaration of performance for material from the same quarry; one for concrete aggregate, another for unbound road material. The scope of testing differs. Material with a road fill declaration may never have had the characteristics needed for concrete measured at all.

Third, the expression NPD in the performance table. NPD means that no performance has been determined for that characteristic, and it is entirely lawful; a producer is not obliged to measure a property that is not required in the market where the product will be used. But if you see NPD against a characteristic that is critical for you, the suitability of that product for that job is not documented. If you see NPD on lines such as freeze-thaw resistance, alkali-silica reactivity, abrasion resistance or chloride content, you need to ask the producer for a separate test report.

Finally, look at the system. The system applied in verifying the constancy of performance shows how far an independent body is involved. For products of structural importance this system is stricter and the notified body monitors the factory continuously; for lower-risk products the producer’s own declaration governs. If the document gives a notified body number, you can check whether that body is authorised for the product concerned.

Which Document Is Required for Which Product?

The thing most often confused on site is asking for the same document for every product. Product groups are subject to different regulations and the paperwork required changes.

Ready-mix concrete arrives on site fresh and takes its shape in place; it is not packaged and labelled like a CE marked manufactured item. For ready-mix concrete the key document is the delivery note that comes with every load: it states the concrete class, consistency class, maximum aggregate size, exposure class, admixture details and loading time. Behind it sit the producer’s certificate of conformity under TS EN 206, the production control records and the laboratory results. The right approach is to ask for these documents once at the ordering stage and for the results periodically. For more on choosing a class, see our article on ready-mix concrete classes.

For cement, look for the CE mark and the declaration of performance. Cement is among the product groups subject to the strictest verification system of all construction products; a notified body monitors the production site continuously and takes samples. The cement type and strength class must be legible on the bag.

For aggregate, the standard that applies depends on the intended use. Concrete aggregate falls under TS EN 12620, unbound and hydraulically bound road materials under TS EN 13242, aggregates for bituminous mixtures under TS EN 13043 and mortar aggregate under TS EN 13139. Material from the same quarry may be covered by different declarations; ask for the one that matches your job. A declaration sets out lines such as particle size distribution, fines content, particle shape, methylene blue value, Los Angeles abrasion class and freeze-thaw behaviour. We covered the effect of aggregate performance on concrete strength in our article on aggregate quality.

For precast concrete elements the standard changes with the product type. Concrete pipes and fittings fall under TS EN 1916, manholes and inspection chambers under TS EN 1917, concrete paving blocks under TS EN 1338, concrete flags under TS EN 1339 and kerbs under TS EN 1340; the general rules for precast concrete products are collected in TS EN 13369. On these products the CE mark is applied to the element or its label, and the declaration of performance arrives with the delivery. For a comparison of standards when choosing a pipe, see our article on concrete pipe or reinforced concrete pipe.

Pumice blocks and other aggregate concrete masonry units fall under TS EN 771-3. On the declaration of performance, look for lines such as compressive strength, dimensions and dimensional tolerance class, gross dry density, water vapour permeability, thermal conductivity and reaction to fire class. Whether the wall is loadbearing directly determines the compressive strength you should be looking for. For the properties of the material itself, see our article on pumice blocks.

Checking Documents on Site: A Three-Minute Routine

A document check carried out before the truck is discharged is a check; carried out afterwards it is filing. The routine that works on site consists of three steps: read the label, compare it with the delivery note, match it against the declaration. If the three do not agree, the load is in dispute.

On palletised and packaged products the label is on the packaging; on blocks, flags and kerbs it may be trapped under the pallet wrapping, so look as you take the first pallet off. On concrete pipes and manhole units the marking is usually applied to the inside face or the socket area, where the production date, class and producer code can be read. Bulk aggregate carries no label on the product itself; traceability rests entirely on the weighbridge ticket and the delivery note.

There are only a few fields to compare: product description, class or type, dimensions, place of production and batch details. If they agree, the document belongs to that load. If they do not, then even if the producer is right, the declaration in your hand is the declaration for another product and you have taken delivery of that load without documentation.

You also need to look at the load itself. If sand declared as “washed” arrives dusty and full of clay, the document is not describing what is on site. Checking the documents and inspecting by eye do not replace one another; both are done. If the two contradict each other, keeping a record and asking the producer for an explanation fixes the argument to the day the load arrived.

How to Spot a False or Incomplete Document

Most of what is met on site is not outright forgery but the wrong document presented in place of the right one. Recognising the five most common cases solves the greater part of the problem.

First, presenting a quality management system certificate in place of a product document. An ISO 9001 certificate describes the manufacturer’s management system; it says nothing about the performance of the product. In the same way, a membership certificate, an award or a promotional certificate is not a conformity document. Second, submitting a test report instead of a conformity document. A test report is the result for a single sample on a single day; it does not cover continuous production control or traceability. It is valuable, but it does not take the place of the declaration.

Third, a shift in scope. The document is genuine and so is the manufacturer, but it covers a different product type, a different size range or a different intended use. Being handed a road material declaration when you asked for concrete aggregate belongs in this category. Fourth, an out-of-date document: a declaration referring to a withdrawn version of a standard, or one whose production site is no longer operating. Check the date and the year of the version of the standard.

Fifth, unverifiable details of the assessment body. If a document names a notified body and gives its number, you can check whether that body is authorised for the product concerned. Be suspicious when there is no number, when the name of the body is vague, or when only a logo has been placed on the page. Physical signs are telling as well: a declaration with no signature or date, text photocopied so many times it is illegible, fields filled in afterwards in a different typeface, or a page still carrying traces of another company.

When you have doubts, the path to follow is simple. First ask the producer for the original copy, wet-signed or electronically signed. Then compare the product type code on the declaration with the delivery note and the label. If necessary, ask the body named on the document directly. Finally, raise your level of scrutiny over the documents for any construction product priced noticeably below the market; most of the non-conforming material met on site follows an attractive offer.

Filing the Documents: Building Inspection and the Occupancy Permit Process

A document that has been collected but cannot be found is worthless. The simplest arrangement that works on site is a single folder divided by material group, with delivery note and declaration pairs filed in date order under each group. The same logic applies to digital copies: as each load arrives, the delivery note and the label are photographed on a phone, named with the date and the product, and dropped into a shared folder. This two-minute habit answers a question that comes up months later.

The critical thing is being able to tie the material to the building element. Which floor’s wall was built with blocks from which batch, which line was laid with pipes from which delivery, which fill layer used which aggregate? This matching is established with a single line on the material acceptance form and, if a problem emerges later, narrows the investigation from the whole building to a single area. On a site with no traceability, even a small doubt turns into an investigation covering the entire structure.

On jobs subject to statutory building inspection this file is required in any case; the inspector will not sign without seeing the product conformity documents. But a complete inspection file is not there to reassure you — it is there so that you have no trouble at the occupancy stage. A document found to be missing during the occupancy permit process has to be dug out of the producer’s archive years later, and that is not always possible.

Putting the paperwork into the contract ends the argument on site before it starts. It is enough to include the sentence “the relevant declaration of performance or G mark certificate of conformity shall be supplied in Turkish with every delivery; deliveries without documentation will not be accepted” in the supply contract. Serious producers are not troubled by this clause; a supplier who is troubled by it has already given you a signal.

Checklist Before Ordering and at the Moment of Delivery

The list below has been kept short enough to pin up in the site office. All of it applies before ordering, and the first three items apply to every delivery.

  1. Do the product descriptions on the label, the delivery note and the declaration of performance agree?
  2. Is the intended use in the declaration the same as my job?
  3. Does the appearance of the load match the declaration (grading, cleanliness, surface, proportion of broken material)?
  4. Is there an NPD against a characteristic that is critical for me?
  5. Is the document in Turkish, signed and dated, and is the version of the standard it refers to current?
  6. Is there a notified body number, and is that body authorised for this product?
  7. Is the exposure condition (sea, salt, freeze-thaw, sulphate) defined in the design, and does the declaration cover it?
  8. Has the document been filed together with the batch received, and has it been recorded which element the material was used in?

For structures on the coast, items four and seven come to the fore. We explained in detail how durability is built up in a salt-laden environment in our article on concrete by the sea; checking the documents is the counterpart on paper of the technical decisions in that article.

When you plan material supply along the Bodrum and Milas corridor, treat documentation as part of the supply plan. Among our group companies, İTS Maden produces aggregate, crushed stone and sub-base material, Bodrum Beton produces ready-mix concrete and Bodrum Boru produces concrete pipes and precast infrastructure elements; the relevant conformity documents are shared with the delivery in every product group. If you would like to draw up the material and document list for your project together, you can reach us through the contact page.

Frequently Asked Questions

Can a product carry both the CE mark and the G mark?
Normally no. CE is for products that have a harmonised European standard; G is for products that have no such standard and are subject to national regulation. The two scopes are mutually exclusive, so a product falls in one field or the other.
Should I look for a CE mark on ready-mix concrete?
Ready-mix concrete does not carry a CE mark in the way a packaged, labelled manufactured product does. The key document on site is the delivery note that comes with every load; behind it sit the producer’s certificate of conformity under TS EN 206 and the production control records. The right way is to ask for these records at the ordering stage.
Does an NPD on the declaration of performance mean the product is poor?
No; NPD simply states that no performance has been determined for that characteristic, and it is entirely lawful. But if that characteristic is critical for your job — freeze-thaw resistance or alkali-silica reactivity, for example — the suitability of the product is not regarded as documented, and you need to ask for a separate test report.
The producer sent an ISO 9001 certificate; is that enough?
It is not enough. ISO 9001 certifies the producer’s quality management system, not the performance of the product. You need to ask separately for a declaration of performance or a G mark certificate of conformity for the product; the two do not take each other’s place.
Who asks for the document, and when should they ask?
The person taking delivery of the material on site, that is the site manager or the inspector they have appointed, asks for it, and asks before the vehicle is discharged. A document asked for after discharge is filing, not checking; if a non-conformity appears, there is no longer any way of turning the load away.
How long should documents be kept?
It is best for them to remain accessible for the life of the structure; at a minimum they are kept until the occupancy permit has been obtained and the statutory liability periods have expired. Keeping a digital copy named with the date and the product alongside the paper file makes the archive usable.